2026-11-17
A hotel group specifies a single Scent Diffuser Machine for a four level lobby and corridor system. The machine is sized correctly, the fragrance is selected, and the installation is completed. When the system is commissioned, the ground floor lobby is over scented and the top floor corridor has almost no fragrance. The machine is blamed, but the machine is not the problem. The distribution line was designed as a single long run without a riser calculation, and the pressure drop through the vertical section consumed most of the available output. Our engineering team has seen this pattern in multi level projects, and we plan the distribution lines before the machine is selected. Shenzhen Scentsea Technology Co., Ltd. has been designing multi level scenting systems for over 10 years.
The distribution line is not an accessory. It is part of the pneumatic circuit. The Scent Diffuser Machine produces a small positive pressure at the outlet, and that pressure must overcome the friction loss in the tubing, the fitting loss, the vertical lift loss, and the discharge loss at the outlet. If the line is long or if the riser is tall, the available pressure at the outlet is reduced, and the fragrance output drops. A machine that is sized for a 10 meter run will not deliver the same output on a 40 meter run with a 15 meter riser. This is why our factory asks for the floor plan and the riser height before we recommend a machine model. The line design and the machine selection must be made together.
The line design also determines the number of zones. A single machine can serve several zones if the line is fitted with solenoid valves that open and close in sequence. The zoning allows the fragrance to be delivered to the occupied areas at different times, which reduces the total fragrance consumption and improves the consistency. A line that is planned without zoning will deliver fragrance to all areas at the same time, and the areas with lower loss will be over scented.
The tube diameter is selected from the flow rate and the allowable pressure drop. The flow rate is set by the machine output and the number of active outlets. The allowable pressure drop is set by the machine outlet pressure minus the discharge pressure required at the outlet. A smaller tube has a higher friction loss and a lower cost, while a larger tube has a lower friction loss and a higher cost. The calculation should be performed for the longest run and the highest riser, because these are the critical paths. The table below shows the typical pressure loss for common tube sizes at a low fragrance flow rate.
| Tube outer diameter | Flow rate | Pressure loss per 10 m horizontal | Pressure loss per 10 m vertical | Typical use |
| 6 mm | 2 to 4 liters per minute | 0.8 to 1.5 kPa | 0.1 to 0.2 kPa plus static head | Single outlet, short branch |
| 8 mm | 4 to 8 liters per minute | 0.5 to 1.0 kPa | 0.1 to 0.2 kPa plus static head | Two to three outlets |
| 10 mm | 8 to 15 liters per minute | 0.3 to 0.6 kPa | 0.1 to 0.2 kPa plus static head | Main riser and main branch |
| 12 mm | 15 to 25 liters per minute | 0.2 to 0.4 kPa | 0.1 to 0.2 kPa plus static head | Long riser and multi zone main |
The static head is the pressure required to lift the fragrance vapor to the highest outlet. The static head is small for a vapor, but it must be included because the vapor density is not zero. Our factory prepares a pressure loss table for each project, and we recommend the tube size that keeps the total loss below 60 percent of the machine outlet pressure. Shenzhen Scentsea Technology Co., Ltd. provides the pressure loss calculation with each multi level quotation.
The riser should be as short and as straight as possible. Every bend adds a fitting loss, and every horizontal offset adds friction. The riser should be placed in a service shaft or a wall cavity that is accessible for inspection, and it should be supported at intervals to prevent sagging. The horizontal branches should be taken from the riser at each floor through a manifold, not through a series of tees along the riser. A series of tees creates a different pressure at each branch, and the lower branches receive more fragrance than the upper branches. A manifold at each floor equalizes the pressure and makes the balancing easier. The table below shows the arrangement options and their effect on balance.
| Arrangement | Balance across floors | Balancing effort | Service access |
| Single riser with series tees | Poor, lower floors over scented | High, each branch needs a valve | Difficult, tees are inside the wall |
| Single riser with floor manifolds | Good, manifold equalizes pressure | Moderate, one valve per floor | Good, manifold is in a service box |
| Dual riser with zone valves at the machine | Very good, zones are independent | Low, zones are controlled at the machine | Good, service is at the machine room |
| Dedicated machine per floor | Excellent, each floor is independent | None, no balancing required | Excellent, service is local |
System designer's note: The dual riser arrangement with zone valves at the machine is the best compromise for a building with four to eight floors. The riser is still required, but the zones are controlled at the machine room, and the balancing is performed with the zone valves. Our factory supplies the zone valve manifold and the control board for this arrangement. Shenzhen Scentsea Technology Co., Ltd. can also supply a dedicated machine per floor when the building has a very large footprint or when the riser route is not available.
The tubing material must be compatible with the fragrance oil and the carrier gas. Some plastics absorb the fragrance and release it slowly, which changes the scent profile and wastes oil. The tubing should be made from PTFE, FEP, or a fragrance resistant nylon. The fittings should be push to connect or compression type, and they should be tested for leak tightness at the operating pressure. The tubing should not be transparent if it is exposed to sunlight, because the UV can degrade the fragrance. The table below shows the material options and their suitability.
| Material | Fragrance absorption | UV resistance | Typical use |
| PTFE | Very low | Good | Main riser, critical branch |
| FEP | Low | Good | Branch and outlet connection |
| Fragrance resistant nylon | Moderate | Moderate | Short branch inside a wall |
| Standard PVC | High | Poor | Not recommended |
Our factory uses PTFE for the main riser and FEP for the branch and outlet connection. The fittings are push to connect with a double O ring, and they are tested at 100 kPa for 10 minutes before the line is closed. We also install a drain valve at the lowest point of the riser so that the line can be purged during service. Scentsea supplies the tubing, the fittings, and the purge kit as a single package for each project.
The commissioning has three steps. The first is the leak test. The line is pressurized with dry air at 100 kPa and held for 10 minutes, and every joint is checked with a leak detection solution. The second is the flow test. Each outlet is measured with a flow meter, and the zone valve is adjusted so that each outlet receives the design flow. The third is the scent intensity test. The fragrance is released in each zone, and the intensity is measured with a handheld sensor or assessed by a panel. The zone valve is adjusted again so that the intensity is uniform across the zones. Our factory provides a commissioning sheet that lists the target flow, the measured flow, the target intensity, and the measured intensity for each outlet. Shenzhen Scentsea Technology Co., Ltd. can provide a commissioning engineer for large projects.
The commissioning should be repeated after any change to the line, such as a new branch or a new outlet. A line that is balanced at the factory may not be balanced after the installation, because the actual riser height and the actual branch length may differ from the drawing. The commissioning sheet should be kept with the system manual so that the balancing can be repeated when the system is serviced.
Summary and Recommendation: A multi-level Scent Diffuser Machine project should start with the line layout, not with the machine model. The tube diameter should be calculated for the critical path, the riser should be straight and supported, the branches should be taken from floor manifolds, and the materials should be fragrance resistant. The system should be commissioned with a leak test, a flow test, and an intensity test, and the balancing record should be kept with the manual. When the line is planned correctly, the fragrance is uniform across the floors and the machine operates within its design range.